Most major dock repairs started as a small problem someone missed. A short checklist each season catches them early.
Spring: wake it up
- Inspect winches and cables for fraying, rust or kinks. Check these at least once a year.
- Check the fasteners holding floats to the frame. This is also an annual check.
- Look at the hinge pin where the walkway meets the dock. Wear here is a safety risk.
- Check welds for cracks or looseness.
- Test lighting, outlets and ground-fault protection.
- Look for float damage, leaks or low spots.
Summer: keep it clean
- Rinse algae and pollen to prevent slippery decking.
- Check bumpers, cleats and ladders.
- Watch for loose boards, nails or screws.
- Keep walkways clear of tripping hazards.
Fall: prepare
- Clear leaves and debris from the deck and under the dock.
- Fix small repairs before winter.
- Tighten hardware, re-check cables and secure everything loose.
Winter: protect
- Secure lifts and canopies.
- Check the dock after storms and high winds.
- Never ignore a dock that sits at a new angle. Something moved.
A written condition report every spring gives you a record for repairs, resale and insurance. It is a core part of our care plans.
Rules, fees and forms change. Always confirm current requirements with the U.S. Army Corps of Engineers Lake Lanier Project Management Office (also called the Operations Management Office) before you build, replace, sell or move a dock.